Spent about 2.5hrs. in the garage today. Got some sheetmetal trimmed out to allow the pass. side 2 X 3 frame rails to be installed. Also did the last of the welding on the drivers side for now. Got a little bit more welding left to do but I gotta wait until I start installing my cage to finish that up. Gonna start fitting the pass. side rail soon.
Last edited by black88coupe; 02-15-2010 at 09:22 PM.
|